Chatango

Tuesday, February 12, 2008

Dynasty Garden Construction - February 2008 sneak preview

Please click HERE for forum discussion.

Taken from the front part of the condo.

The front part of the condo.

Nice perimeter wall finishes.


Guardhouse under construction.



Lobby Area


Still a lot of works to be done.



Water reticulation and TNB cable being laid.


View looking at the commercial area.


Parking area.

Lifts have yet to be installed.
All photos are taken on 12th February 2008.
Keep on logging to this website for more photos.

No comments:

Building Specs and Freebies

Skim Coat Ceiling

300mm x 400mm Ceramic Wall Tiles for Kitchen

300mm x 600mm Ceramic Wall Tiles for Bathroom

800mm x 800mm Ceramic Floor Tiles for Kitchen, Dining & Living

Laminated Timber Flooring for all Bedrooms

Decorative Solid Fired Rated Door to main entrance door

2 nos. of Water Heater point

Free Smart Card System (Lift access)

Free 2 units water Heater for bathroom

Free 2 nos. of Shower Screen for bathroom

Free 4 nos. of A/C point with piping

Free Grille for entrance & Balcony

Free up-grade kitchen wall tiles to wall height

Free up-grade bathroom wall tiles to wall height